The golf course required replacement of 4200 of 8” waterline to upgrade the facility's existing irrigation infrastructure . The designed path of the waterline snaked along the fairway crossing multiple cart paths and drainage ways. Open trenching was not an option due because the golf course sought to preserve its pristine grounds and also did not want disturb golfing operations. Directional boring was the answer because it allowed the course to remain open during the construction.

L & M utilized directional boring for the installation of 4,200 linear feet of 8-inch high-density polyethylene (HDPE) irrigation line. The scope of this project encompassed potholing to verify depths of existing utilities, directional drilling, pipe fusing and pipe placement. L & M also provided fusing for the T's, and valves.

Completed December 2026 - Back To All Projects

20251121_085857.jpg
20251121_085859.jpg
20251121_085901.jpg
20251121_085910.jpg
20251121_085916.jpg
IMG_7864.JPEG
IMG_7865.JPEG
IMG_7866.JPEG
PXL_20251028_192748463.jpg
PXL_20251106_195323829.jpg
PXL_20251106_195325920.jpg
PXL_20251106_195329460.jpg