Chilled Water System - CU Boulder
Bored and installed 8" and 10" HDPE as well as 14" TR Flex ductile iron crossing University of Colorado in Boulder's critical infrastructure.
Summer/Fall 2022 - Back To All Projects
Bored and installed 8" and 10" HDPE as well as 14" TR Flex ductile iron crossing University of Colorado in Boulder's critical infrastructure.
Summer/Fall 2022 - Back To All Projects